When your materials fly, "probably fine" is not a status. One system, no data gaps, no Excel as a parallel universe.
“Our customers audit us the way they’d audit an aerospace supplier - because that’s what we are.”
From any batch, the system walks backwards through its entire genealogy - and forwards to every delivery it touched.
Finished batch → raw-material lot → supplier → QC protocol → the exact production parameters. And the other way: raw-material lot → every production order and customer shipment it entered. Quarantined, expired or blocked lots physically cannot enter production.
Ten domains, one system - every object linked to the next: Opportunity → Contract → Order → Batch → QC → Delivery.
The foundation is a Functional Requirements Document authored by ERP SWISS from department interviews - the single agreed blueprint for configuration, development and acceptance testing. Odoo 19 Enterprise, DEV/PROD environments, role-based access, full audit logging.
A program this size isn't a one-off delivery. It's a working relationship.
Alongside the implementation, RYDENA runs on prepaid engineering packs with a dedicated intake portal and a fully transparent backlog: every request estimated before it's built, every hour visible.
English · French · Russian · Armenian